2021 BMW M5 Base a Mercedes-Benz of Naples
https://spanishmercedes.dealerleads.com/cars/Used/2021/BMW/M5/Base/159907442021 BMW M5 Base
Precio de Venta : $74,575
Vehicle Photos
Fundamentos Del Vehículo
Incentivos Adicionales
- Condición : Used
- Kilometraje : 41,959
- VIN : WBS83CH09MCF68912
- Valores # : P143957A
- Motor :
- Transmisión : 8-Speed Automatic Sport
- Ext. Color : Gray
- Int. Color : Aragon Brown
- Tipo de Vehiculo : Sedan
- Tipo de Cuerpo : 4D Sedan
- Tren de Accionamiento : AWD
Ciudad MPG *
15
MPG en Carretera *
21
*La clasificación MPG real variará con las opciones, condiciones de manejo, hábitos y condición del vehículo.
Información Del Concesionario

Mercedes-Benz of Naples
Mercedes-Benz of Naples
Características Del Vehiculo
- Navigation System
- Connected Package Pro
- Driving Assistance Plus Package
- Executive Package
- 16 Speakers
- AM/FM radio: SiriusXM with 360L
- Bowers & Wilkins Diamond Surround Sound System
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM w/360L
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear dual zone A/C
- Rear window defroster
- Heads-Up Display
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote keyless entry
- Steering wheel memory
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Low tire pressure warning
- M Compound Brakes w/Red Calipers
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Soft-Close Automatic Doors
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Rear-View Camera
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Extended Traffic Jam Assistant
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Heated door mirrors
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Active Driving Assistant Pro
- Active Park Distance Control
- Apple CarPlay & Android Auto Compatibility
- Auto tilt-away steering wheel
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Drive Recorder
- Driver door bin
- Driver vanity mirror
- Enhanced USB & Bluetooth
- Front reading lights
- Garage door transmitter
- Gesture Control
- Heated steering wheel
- Illuminated entry
- Leather Shift Knob
- Leather steering wheel
- Live Cockpit Pro w/Navi
- Outside temperature display
- Parking Assistant Plus
- Passenger vanity mirror
- Rear reading lights
- Rear seat center armrest
- Sport steering wheel
- Surround View w/3D View
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- WiFi Hotspot
- Wireless Charging
- Extended Merino Leather Upholstery
- Front & Rear Heated Seats
- Front Bucket Seats
- Front Center Armrest
- Front Massaging Seats
- Front Ventilated Seats
- Heated Front Seats
- Heated front seats
- Multi-Function Seats w/Lumbar Support
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 19" x 9.5" Fr & 19" x 10.5" Rr Bi-Color
- Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr Black
- Power Rear Sunshade & Rear Side Window Shades
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
- **CLEAN CARFAX
- **LOCAL TRADE-IN
- **LIKE NEW CONDITION
- **PANO ROOF
- **KEYLESS GO
- THIS VEHICLE COMES EQUIPED WITH '
- DRIVING ASSITANCE PLUS PACKAGE
- EXTENDED TRAFFIC JAM ASSIST
- ACTIVE DISTANCE ASSIST PRO
- EXECUTIVE PACKAGE
- FRONT VENTILATED SEATS
- ACTIVE PARK DISTANCE CONTROL
- SOFT CLOSE AUTOMATIC DOORS
- 20' WHEELS
- MULTI FUNCTION SEATS
- M COMPOUND BREAKS
- THIS BEAUTIFUL M5 HAS IT ALL IN GREY METALIC ITH BROWN INTERIOR THIS VEHICLE WILL NOT LAST LONG GIVE US A CALL OR SHOOT US AN EMAIL FOR MORE INFORMATION!!
Renuncia & Informacion Legal
Los precios no incluyen tarifas adicionales y costos de cierre, incluidas tarifas gubernamentales e impuestos, cargos financieros, tarifas de documentación del distribuidor, tarifas de prueba de emisiones u otras tarifas. Todos los precios, especificaciones y disponibilidad están sujetos a cambios sin previo aviso. Póngase en contacto con el distribuidor para obtener la información más actualizada. Los precios son válidos hasta el cierre del negocio, solo hoy.
Thank you for taking the time to look at this vehicle. We can provide you with a personalized video, CarFax, known service history, pictures and any information that makes your decision simple and easy. We provide the market place with cars we are proud of and want our customers to feel the same way. Thanks again and let us know how we can assist you.